Redesigning the distribution network for a ceramics brand
A new hub and spoke network with two regional depots cut freight cost and brought delivery times under 48 hours for most dealers.
ClientCeramics and tiles manufacturer
IndustryBuilding materials
Duration9 months, Nationwide

01 Results
-14%Freight cost per tonne
< 48 hDelivery to 80% of dealers
-60%Transit damage
02 The challenge
All dealers were served directly from the factory. Long trips, part loads and damage were driving up cost and losing sales.
03 What we did
We modelled demand by district, tested network options and selected two depot locations. We then designed depot operations, transport contracts and the dealer ordering cycle, and ran the programme to go-live.
“A clear plan, a disciplined programme and numbers we can see every month.”
Chief Operating Officer, Ceramics and tiles manufacturerNext step
Ready to take cost and waste out of your supply chain?