A new hub and spoke network with two regional depots cut freight cost and brought delivery times under 48 hours for most dealers.

ClientCeramics and tiles manufacturer
IndustryBuilding materials
ServiceEnd-to-End Supply Chain Transformation
Duration9 months, Nationwide
Redesigning the distribution network for a ceramics brand
01 Results
-14%Freight cost per tonne
< 48 hDelivery to 80% of dealers
-60%Transit damage
02 The challenge

All dealers were served directly from the factory. Long trips, part loads and damage were driving up cost and losing sales.

03 What we did

We modelled demand by district, tested network options and selected two depot locations. We then designed depot operations, transport contracts and the dealer ordering cycle, and ran the programme to go-live.

“A clear plan, a disciplined programme and numbers we can see every month.”

Chief Operating Officer, Ceramics and tiles manufacturer