Doubling dispatch capacity in a central FMCG warehouse
A 60,000 sq ft warehouse was missing dispatch cut-offs every evening. New slotting and standard work doubled capacity in the same space.
ClientNational FMCG distributor
IndustryConsumer goods
Duration12 weeks, Narayanganj

01 Results
2xDispatch capacity
99.6%Stock accuracy
-45%Overtime hours
02 The challenge
Pickers walked more than 14 km per shift, stock accuracy was 91 percent and night overtime had become normal.
03 What we did
We re-slotted fast movers near dispatch, introduced wave picking and created standard work for every role. A daily board made performance visible to every team leader.
“The warehouse is calmer at 6 pm than it used to be at 10 am.”